Title 46 Shipping Parts 1 to 40 (Revised as of October 1, 2013)

Title 46 Shipping Parts 1 to 40 (Revised as of October 1, 2013)

4.11 - 1251 ratings - Source



46 CFR Shipping(e) If a spill valve is installed on a cargo tank fitted with a vapor collection system, it must meet the requirements of 46 CFR 39.2009(c). ... the tank is 100 percent liquid-full during a facility-to-vessel cargo transfer; (iii) Activates an alarm and automatic shutdown system on ... pin G connected to the cabling shield, and pins N and T3 reserved for an optional high-level alarm circuit meeting the requirements ofanbsp;...


Title:Title 46 Shipping Parts 1 to 40 (Revised as of October 1, 2013)
Author: Office of The Federal Register, Enhanced by IntraWEB, LLC
Publisher:IntraWEB, LLC - 2013-10-01
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA